Pay in 4 interest-free payments of $3.74 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 31 - Sep 5
Pay in 4 interest-free payments of $3.74 Learn more
Ships within 48 hours · Estimated delivery Aug 31 - Sep 5
ID: 19315
Neighborhoods: Amesbury Center
Size: 25" wide x 37 high
A tunnel was part of a plan to convert the East Boston Tunnel Line and much of the Tremont Street Subway
Thomas Starr King School
BTC Report 01 1895 Sheet 13: Four Track Subway Construction Details, Boston, Massachusetts Waverly NY ID: 19315Subject: Tremont Street Subway (Now MBTA Green Line) Publisher: Boston Transit Commission Type: Architectural Drawing, Print Size: 14. 25" wide x 9" high ID: BIT16662 Collection: WardMaps LLC Atlas: Boston Transit Commission Annual Report 01 1895