Pay in 4 interest-free payments of $11.40 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 31 - Sep 5
Pay in 4 interest-free payments of $11.40 Learn more
Ships within 48 hours · Estimated delivery Aug 31 - Sep 5
installing the barbed splicer
Material: Molded Nylon
These packages are ideal for placement next to a drill press or a workstation for quick access to compressed air for cleaning and blow-off operations
Thermoplastic PVC provides increased working pressure and oil resistance
The Tri-Pod manifold
V2H-1/2 316 Stainless Steel Manual Ball Valve 10' Long installing the barbed splicerMaximum Operating Pressure 1000PSI @ 100F Temperature Range 60 to 450F
US$ 736.00
US$ 160.00
US$ 131.50
US$ 107.00
US$ 172.00